Bilstone Road Tram Track
Tram Track | Birmingham, United Kingdom
With the improvement and extension of the various tram tracks the client was faced with engineering challenges that were overcome by using Adfil products in the concrete. Using Durus Macro fibres meant the project was completed ahead of time with minimal disturbances. Each trackbed could be poured in one go as no steel mesh was used.
Adfil Case study